I need a simulation run using crystal ball application. The excel and instructions are included.

Ace your studies with our custom writing services! We've got your back for top grades and timely submissions, so you can say goodbye to the stress. Trust us to get you there!


Order a Similar Paper Order a Different Paper

I need a simulation run using crystal ball application. The excel and instructions are included.

I need a simulation run using crystal ball application. The excel and instructions are included.
Run Simulation to show your 90% confidence for Total contingency duration and Total contingency cost estimation. 2.1 First, you will run simulation for 90% confidence of your contingency duration 2.1.1 You can use BetaPert distribution for your input assumptions. 2.1.2.Define your individual risk durations as assumptions 2.1.3 Define total contingency duration as Forecast 2.1.4 Run simulation and show 90% confidence 2.2 Repeat step #2.1 for contingency cost and show 90% confidence Submit Excel with simulation data and charts for step #2.1 and #2.2.

Writerbay.net

Looking for top-notch essay writing services? We've got you covered! Connect with our writing experts today. Placing your order is easy, taking less than 5 minutes. Click below to get started.


Order a Similar Paper Order a Different Paper